ORMI Plus
AI Optimization
AI Optimization.
Scan consumption history, lead time and criticality to surface defensible stock reductions.
Include line stoppers
Critical parts need manager sign-off
Open suggestions
3
Potential savings
R 65,200
Average confidence
85%
Parts in catalogue
8
| Part | Current | Proposed | Status | Actions | |||
|---|---|---|---|---|---|---|---|
VFD 5.5kW 400V No failures recorded in 24 months; manufacturer MTBF > 10 years. | min 2 / max 5 | min 1 / max 3 | 74% | R 42,600 | open | ||
PLC CPU 1214C DC/DC/DC Strong candidate but line-stopper risk requires management sign-off. | min 2 / max 6 | min 1 / max 3 | 61% | R 34,000 | approved with risk | ||
Pneumatic cylinder 50mm bore Average monthly consumption 1.2; current stock covers 9 months. | min 4 / max 12 | min 3 / max 8 | 92% | R 11,500 | open | ||
Filter regulator 3/8" Wear part with 18-day lead time; safety buffer can be reduced. | min 4 / max 10 | min 2 / max 6 | 88% | R 11,100 | open |