ORMI Plus

AI Optimization

AI Optimization.

Scan consumption history, lead time and criticality to surface defensible stock reductions.

Include line stoppers

Critical parts need manager sign-off

Open suggestions

3

Potential savings

R 65,200

Average confidence

85%

Parts in catalogue

8

PartCurrentProposedStatusActions

VFD 5.5kW 400V

No failures recorded in 24 months; manufacturer MTBF > 10 years.

min 2 / max 5min 1 / max 3
74%
R 42,600
open

PLC CPU 1214C DC/DC/DC

Strong candidate but line-stopper risk requires management sign-off.

min 2 / max 6min 1 / max 3
61%
R 34,000
approved with risk

Pneumatic cylinder 50mm bore

Average monthly consumption 1.2; current stock covers 9 months.

min 4 / max 12min 3 / max 8
92%
R 11,500
open

Filter regulator 3/8"

Wear part with 18-day lead time; safety buffer can be reduced.

min 4 / max 10min 2 / max 6
88%
R 11,100
open